国产欧美日韩三级,日韩a一级欧美一级,韩国美女高清爽快一级毛片,国产人妖在线,在线精品自拍,精品一区二区三区在线视频,一区二区三区视频网站

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.